Melt Pump
- Polymer extrusion melt gear pump
- melt pump for plastic extrusion
- Polymer Reaction Kettle pump
- gear pump rubber extruder
- melt pumps for extrusion
- Melt Gear Pumps for BOPP Films
- ZB-G bearing external melt pump
- melt pump for pvc extrusion
- ZB double shaft drive melt pump
- Explanation of terms for melt pump d
- ZB-X Series chemical gear melt pump
- PID Control System for extrusion
- PLC Control System for extruder
- ZB-U series melt extrusion spinning
- ZB-E series transfer melt pump for e
- ZB-H series high temperature and hig
- ZB-R series gear melt pump for rubbe
- ZB-K series chemical stainless steel
- ZB-D series pipeline melt pump for p
- ZB-F series melt pump for reaction k
- ZB-B series dosing standard thermopl
- ZB-C series plastic granule machine
Screen Changer
- polymer melt filtration screen changer
- recycled plastic screen changer
- slide plate screen changer
- pillar screen changer
- dual bolt screen changer
- continuous screen changer
- screen changer polymer filter
- Plastic extruder filter extrusion sc
- Biodegradable plastic PBAT/PLA hydra
- Single plate hydraulic screen change
- plastic extrusion screen changer
- single plate hydraulic quick screen
- Manual control screen changer
- Double plate continuous hydraulic sc
- Automatic mesh belt continuous scree
- Double piston four screen cavities c
- Single plate double screen cavities
- Single piston double screen cavities
- Double piston four screen cavities b
- Dual Bolt double screen cavities hyd
Feeding System
- force feeder extruder
- loss in weight feeder for masterbatc
- continuous feeding system
- Liquid loss in weight feeder
- china volumetric screw doser feeder
- Multi-component loss in weight feede
- Micro loss in weight metering feeder
- Single screw gravimetric dosing feed
- Twin screw loss in weight metering f
melt blown progress
contact us
- Batte Machinery Zhengzhou Co., Ltd.
- E-mail: info@battemachinery.com
- whatsapp: +86 158 38331071
- Tel: +86 371 67991755
- After-sales Tel: +86 371 67997677 / 67997877
- Address:No.11 Changchun Road, High-tech Zone, Zhengzhou, China.
News
- The Superstar for Transporting High-
- Recycled Plastic Screen Changer
- How does the reactor kettle melt pum
- What factors should be considered wh
- Detailed structure of single plate h
- polyethyene monofilament extruder sc
- Installation target for pelletizing
- PVC Granulator with Hydraulic Screen
- Melt pump application areas and four
- Plastic Extrusion Manual Screen Chan
Details of the steps for subsequent debugging after the installation of the melt pump is completed
Zhengzhou BATTE is a professional melt pump production and manufacturing enterprise, providing melt pumps widely used in extrusion molding of plastic, resin, rubber, and chemical fiber products. After the installation and parameter setting of the melt pump are completed, the system can be put into operation. This article provides a detailed introduction to the steps and details of subsequent debugging after the installation of the melt pump.
1. Start preheating the front section, pump body, and rear section of the melt pump.
2. After the temperature of the melt pump reaches the set temperature, remove the cover of the motor fan and manually rotate the fan blades to drive the melt pump to rotate. It is normal to have no sticking points, no abnormal noise, and smooth rotation.
3. Then keep the automatic knob of the handle in manual mode.
4. Set the frequency of the melt pump to around 5HZ and the host to around 3HZ. Increase the host frequency to around 0.5HZ and stop for a while, and constantly observe changes in inlet pressure.
5. When the pressure reaches the set pressure, let it stabilize for a while and then switch to automatic mode.
6. After the main machine is automatic, slowly increase the frequency of the melt pump to around 1HZ at a time until it meets the feeding requirements of the mold head.
7. During the trial operation, attention should be paid to observing the changes in various parameters. If there are any abnormalities, please turn off the automatic control status. Check and promptly eliminate the cause. In emergency situations, the emergency stop button can be pressed to stop the system.
8. Please refer to the debugging instructions for detailed usage.
Customers must pay attention to the startup sequence during actual operation: start the melt gear pump first, and then start the main motor. Shutdown sequence: First turn off the main motor, then turn off the pump.
Email: info@battemachinery.com
Whatsapp: +86 158 38331071
Previous:Application of Low Pressure and High Flow Electric Heating Melt Metering PumpNext:PVC waterproof melt pump