BATTE Machinery China
WhatsApp: +86 158 38331071    HOT LINE: +86 371 67991755      EMAIL: sale@meltpump.com
Batte melt pump > News

Melt Pump

Screen Changer

Feeding System

melt blown progress

contact us

Batte Machinery Zhengzhou Co., Ltd.
E-mail: sale@meltpump.com
whatsapp: +86 158 38331071
Tel: +86-371-67991755 / 67992755
FAX:+86-371-67993277
Address:No.11 Changchun Road, High-tech Zone, Zhengzhou, China.

News

Precautions for the use of melt pumps

The use of extruder melt pumps need to pay attention to the following matters, first of all, the installation should be correct, to ensure that the pump and pipeline connection is tight and solid, to avoid leakage. Before starting the pump, check whether the parts are intact and whether the gear rotation is flexible.

melt pump for extrusion

During operation, pay close attention to the pressure, flow and other parameters, if there is any abnormality, it should be stopped in time for inspection. Strictly control the melt temperature to avoid too high or too low to affect the performance and life of the pump.

polymer melt gear pump

Regular maintenance of the melt pump, clean up the residual melt in the pump, check the wear and tear of gears, seals and other parts and replace them in time. Follow the operating procedures during operation to avoid damage to the equipment due to misoperation. At the same time to train operators to improve their understanding of the melt pump and operating skills.

Email: sale@meltpump.com

WhatsApp: +86 158 38331071

Previous:Plastic-steel strapping screen changer
Next: I'm sorry no