BATTE Machinery China
WhatsApp: +86 158 38331071    HOT LINE: +86 371 67991755      EMAIL: info@battemachinery.com
Batte melt pump > News

Melt Pump

Screen Changer

Feeding System

melt blown progress

contact us

Batte Machinery Zhengzhou Co., Ltd.
E-mail: info@battemachinery.com
whatsapp: +86 158 38331071
Tel: +86 371 67991755
After-sales Tel: +86 371 67997677 / 67997877
Address:No.11 Changchun Road, High-tech Zone, Zhengzhou, China.

News

Some instructions in the operation manual of the double-plate fast non-stop screen changer

The dual-plate fast non-stop screen changer has a dual-channel dual-filter screen structure, and the dual screens can work at the same time; when the screen is changed, one screen works and one screen is replaced, which can realize non-stop screen change. For the key contents of the operation manual of the double-plate quick screen changer, Zhengzhou Bart screen changer manufacturer will give a detailed explanation.

1. The screen change position of the double-plate screen changer refers to the position when the slide plate is fully pulled out.

2. The charging position of the double-plate screen changer refers to the position where the net port is completely submerged in the main body of the screen changer and the exhaust port is exposed outside the main body.

3. The working position of the double-plate screen changer refers to the position when the slide plate is fully pushed out.

4. The "start" button on the operating handle of the hydraulic station is a self-locking button, and it will self-lock after being pressed down, and the "stop" button on the operating handle can be disconnected.

single plate quick screen changer

5. The "stop" button on the operating handle of the hydraulic station is a jog button. After the jog, the "start" button of the hydraulic station pops up and the hydraulic station is powered off. When released, the "Stop" button will automatically reset.

6. The double-plate quick screen changer has two screens A and B. In the hydraulic station, the "A push", "A pull" and "B push" and "B pull" buttons are all inching buttons. When pushing or pulling the A and B slides, you need to press and hold them. A and B slides are pushing or pulling. During the process, release the button to stop the movement of the skateboard. At this time, the hydraulic station motor is still working, and the "stop" button should be pressed in time to close the hydraulic station.

7. The hydraulic pressure of the double-plate quick screen changer should not exceed 18Mpa. If the pressure of the hydraulic station reaches 18 Mpa, the slide plate of the screen changer still cannot be pushed and pulled smoothly, please shut down the hydraulic station immediately and consult the relevant technical personnel of our company.

Zhengzhou Batte's professional screen changer manufacturer provides screen changers including: plastic extruder screen changer, plastic die head hydraulic screen changer, melt blown double-column hydraulic screen changer, etc. Screen changer manufacturer consultation online: info@battemachinery.com

Previous:Why install a screen changer downstream of the melt pump?
Next:Ten steps to the correct installation of a melt pump